Assessment Year | 2025 |
---|---|
Principal Product | Aerospace Composites and Honeycomb |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
90,000
ft2
|
Annual Production | 250
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $207,698 | 5,179,500 |
kWh
|
$0.040 |
Electricity Demand | $62,671 | 11,937 |
kW-mo/yr
|
$5.25 |
Electricity Fees | $19,588 | - |
|
- |
LPG | $257,919 | 13,563 |
MMBtu
|
$19.02 |
TOTAL YEARLY COSTS | $547,876 | |||
RECOMMENDED SAVINGS* | $102,624 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.7212: Install or upgrade insulation on hvac distribution systems | $22,742 | $12,849 |
$22,393
558,432
kWh
|
$349
-
kW-mo/yr
|
- | |
02 | 2.2123: Insulate feedwater tank | $1,063 | $489 |
$1,047
26,110
kWh
|
$16
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,132 | $25,000 |
$6,038
150,562
kWh
|
$94
-
kW-mo/yr
|
- | |
04 | 2.1116: Improve combustion control capability | $52,839 | $2,112 | - | - |
$52,839
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $19,848 | $210,600 |
$19,556
487,620
kWh
|
$292
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $102,624 | $251,050 |
$49,034
1,222,724
kWh
|
$751
-
kW-mo/yr
|
$52,839
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs