ITAC Assessment: UW2503
ITAC logo
ITAC Assessment: UW2503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aerospace Composites and Honeycomb
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 90,000
ft2
Annual Production 250
ton
Production Hrs. Annual 8,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,698 5,179,500
kWh
Electricity Demand $62,671 11,937
kW-mo/yr
Electricity Fees $19,588 -
LPG $257,919 13,563
MMBtu
TOTAL YEARLY COSTS $547,876
RECOMMENDED SAVINGS* $102,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7212: Install or upgrade insulation on hvac distribution systems $22,742 $12,849 $22,393
558,432
kWh
$349
-
kW-mo/yr
-
02 2.2123: Insulate feedwater tank $1,063 $489 $1,047
26,110
kWh
$16
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,132 $25,000 $6,038
150,562
kWh
$94
-
kW-mo/yr
-
04 2.1116: Improve combustion control capability $52,839 $2,112 - - $52,839
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $19,848 $210,600 $19,556
487,620
kWh
$292
-
kW-mo/yr
-
TOTAL RECOMMENDED $102,624 $251,050 $49,034
1,222,724
kWh
$751
-
kW-mo/yr
$52,839
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs