Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Refrigerated Systems
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 243
Plant Area 300,000
ft2
Annual Production 12,250
units
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,870 5,377,400
kWh
Electricity Demand $140,191 10,370
kW-mo/yr
Electricity Fees $10,306 -
Natural Gas $74,583 6,066
MMBtu
Waste Disposal Costs
Water Usage $10,064 1,603
Tgal
Water Disposal $12,835 3,344
Tgal
TOTAL YEARLY COSTS $691,849
RECOMMENDED SAVINGS* $185,936 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,189 $1,523 $4,189
50,781
kWh
-
02 2.9114: Use solar heat to make electricty $115,378 $781,550 $89,144
1,080,537
kWh
$26,234
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $47,575 $72,865 $45,659
553,440
kWh
$1,916
-
kW-mo/yr
04 2.7135: Install occupancy sensors $11,642 $2,942 $10,243
124,157
kWh
$1,399
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,152 $8,843 $7,152
86,687
kWh
-
TOTAL RECOMMENDED $185,936 $867,723 $156,387
1,895,602
kWh
$29,549
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs