Assessment Year | 2023 |
---|---|
Principal Product | Refrigerated Systems |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 243 |
Plant Area |
300,000
ft2
|
Annual Production | 12,250
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $443,870 | 5,377,400 |
kWh
|
$0.083 | |
Electricity Demand | $140,191 | 10,370 |
kW-mo/yr
|
$13.52 | |
Electricity Fees | $10,306 | - |
|
- | |
Natural Gas | $74,583 | 6,066 |
MMBtu
|
$12.30 | |
Waste Disposal Costs | |||||
Water Usage | $10,064 | 1,603 |
Tgal
|
$6.28 | |
Water Disposal | $12,835 | 3,344 |
Tgal
|
$3.84 | |
TOTAL YEARLY COSTS | $691,849 | ||||
RECOMMENDED SAVINGS* | $185,936 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,189 | $1,523 |
$4,189
50,781
kWh
|
- | |
02 | 2.9114: Use solar heat to make electricty | $115,378 | $781,550 |
$89,144
1,080,537
kWh
|
$26,234
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $47,575 | $72,865 |
$45,659
553,440
kWh
|
$1,916
-
kW-mo/yr
|
|
04 | 2.7135: Install occupancy sensors | $11,642 | $2,942 |
$10,243
124,157
kWh
|
$1,399
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,152 | $8,843 |
$7,152
86,687
kWh
|
- | |
TOTAL RECOMMENDED | $185,936 | $867,723 |
$156,387
1,895,602
kWh
|
$29,549
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs