ITAC Assessment: MS0424
ITAC logo
ITAC Assessment: MS0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cylinder Carts, Cages, Pallets, Truck Beds, Trailers
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 130,000
ft2
Annual Production 35,000
units
Production Hrs. Annual 1,920
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,551 1,348,200
kWh
Electricity Fees $16,649 -
Natural Gas $88,839 7,808
MMBtu
LPG $87,848 2,939
MMBtu
Waste Disposal Costs
Water Usage $713 247
Tgal
TOTAL YEARLY COSTS $287,600
RECOMMENDED SAVINGS* $132,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,613 $19,215 $7,613
108,751
kWh
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $74,358 $275,000 $(-13,490.4)
(-192,720)
kWh
$87,848
-
MMBtu
03 2.9114: Use solar heat to make electricty $50,990 $507,500 $50,990
728,422
kWh
-
TOTAL RECOMMENDED $132,960 $801,715 $45,112
644,453
kWh
$87,848
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs