ITAC Assessment: TT0314
ITAC logo
ITAC Assessment: TT0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Intake Manifolds
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 260,000
ft2
Annual Production 88,200
units
Production Hrs. Annual 3,920
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,027 2,956,800
kWh
Electricity Demand $122,398 8,417
kW-mo/yr
Natural Gas $31,097 4,429
MMBtu
LPG $36,074 1,036
MMBtu
Waste Disposal Costs
Water Usage $162 48
Tgal
Water Disposal $418 48
Tgal
TOTAL YEARLY COSTS $432,176
RECOMMENDED SAVINGS* $120,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4321: Upgrade obsolete equipment $51,299 $312,500 $9,699
118,420
kWh
- - $41,600 -
02 2.1321: Replace fossil fuel equipment with electrical equipment $36,167 $16,000 $(-2,305.0)
(-28,140)
kWh
- $36,072
-
MMBtu
- $2,400
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,281 $1,500 $8,604
105,056
kWh
$4,677
-
kW-mo/yr
- - -
04 2.4237: Substitute compressed air cooling with water or air cooling $8,319 $9,842 $8,319
101,579
kWh
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,118 $21,260 $4,118
50,278
kWh
- - - -
06 2.4133: Use most efficient type of electric motors $4,036 $8,059 $2,623
32,026
kWh
$1,413
-
kW-mo/yr
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $2,112 - $2,112
25,793
kWh
- - - -
08 2.4112: Install soft-start to eliminate nuisance trips $1,111 $4,500 - - - - $1,111
TOTAL RECOMMENDED $120,443 $373,661 $33,170
405,012
kWh
$6,090
-
kW-mo/yr
$36,072
-
MMBtu
$41,600 $3,511
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs