| Assessment Year | 1997 |
|---|---|
| Principal Product | Theatrical scenery |
| NAICS |
n/a
|
| SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
230,000
ft2
|
| Annual Production | 624
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $254,648 | 2,798,652 |
kWh
|
$0.091 |
| Electricity Demand | $237,832 | 10,960 |
kW-mo/yr
|
$21.70 |
| Natural Gas | $16,605 | 2,162 |
MMBtu
|
$7.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,548 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,645 | $4,563 |
$7,121
82,356
kWh
|
$3,524
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,208 | $1,900 | - | - |
$9,208
-
MMBtu
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,903 | $1,800 |
$1,419
16,413
kWh
|
$484
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 3.4151: Minimize water usage | $3,510 | $2,718 | - | - | - |
$3,510
-
Tgal
|
- | - | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $20,000 | $75,000 | - | - | - | - |
$20,000
-
lb
|
- | |
| 06 | 4.423: Move product using mechanical means | $3,745 | $4,500 | - | - | - | - | - | $3,745 | |
| TOTAL RECOMMENDED | $49,011 | $90,481 |
$8,540
98,769
kWh
|
$4,008
-
kW-mo/yr
|
$9,208
-
MMBtu
|
$3,510
-
Tgal
|
$20,000
-
lb
|
$3,745 | ||
| TOTAL IMPLEMENTED | $12,548 | $6,363 |
$8,540
98,769
kWh
|
$4,008
-
kW-mo/yr
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs