ITAC Assessment: HO0144
ITAC logo
ITAC Assessment: HO0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Theatrical scenery
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 230,000
ft2
Annual Production 624
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,648 2,798,652
kWh
Electricity Demand $237,832 10,960
kW-mo/yr
Natural Gas $16,605 2,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,645 $4,563 $7,121
82,356
kWh
$3,524
-
kW-mo/yr
- - - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $9,208 $1,900 - - $9,208
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,903 $1,800 $1,419
16,413
kWh
$484
-
kW-mo/yr
- - - -
04 3.4151: Minimize water usage $3,510 $2,718 - - - $3,510
-
Tgal
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $20,000 $75,000 - - - - $20,000
-
lb
-
06 4.423: Move product using mechanical means $3,745 $4,500 - - - - - $3,745
TOTAL RECOMMENDED $49,011 $90,481 $8,540
98,769
kWh
$4,008
-
kW-mo/yr
$9,208
-
MMBtu
$3,510
-
Tgal
$20,000
-
lb
$3,745
TOTAL IMPLEMENTED $12,548 $6,363 $8,540
98,769
kWh
$4,008
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs