ITAC Assessment: MS0440
ITAC logo
ITAC Assessment: MS0440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aluminum Cylinders
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 210,000
ft2
Annual Production 2,293,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $481,015 10,596,449
kWh
Electricity Demand $340,032 24,372
kW-mo/yr
Electricity Fees $55,680 -
Natural Gas $155,739 36,569
MMBtu
LPG $87,848 2,939
MMBtu
Waste Disposal Costs
Water Usage $25,775 7,108
Tgal
Water Disposal $1,921 4,757
Tgal
TOTAL YEARLY COSTS $1,148,011
RECOMMENDED SAVINGS* $286,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,241 $17,637 $10,241
212,859
kWh
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $79,176 $275,000 $(-8,672.4)
(-192,720)
kWh
$87,848
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,155 - $3,155
70,121
kWh
-
04 2.9114: Use solar heat to make electricty $193,096 $2,257,766 $193,096
3,176,285
kWh
-
05 2.7135: Install occupancy sensors $622 $2,945 $622
13,833
kWh
-
TOTAL RECOMMENDED $286,290 $2,553,348 $198,442
3,280,377
kWh
$87,848
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs