| Assessment Year | 2025 |
|---|---|
| Principal Product | Aluminum Cylinders |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
210,000
ft2
|
| Annual Production | 2,293,000
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $481,015 | 10,596,449 |
kWh
|
$0.045 | |
| Electricity Demand | $340,032 | 24,372 |
kW-mo/yr
|
$13.95 | |
| Electricity Fees | $55,680 | - |
|
- | |
| Natural Gas | $155,739 | 36,569 |
MMBtu
|
$4.26 | |
| LPG | $87,848 | 2,939 |
MMBtu
|
$29.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $25,775 | 7,108 |
Tgal
|
$3.63 | |
| Water Disposal | $1,921 | 4,757 |
Tgal
|
$0.40 | |
| TOTAL YEARLY COSTS | $1,148,011 | ||||
| RECOMMENDED SAVINGS* | $286,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $13,396 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,241 | $17,637 |
$10,241
212,859
kWh
|
- | |
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $79,176 | $275,000 |
$(-8,672.4)
(-192,720)
kWh
|
$87,848
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,155 | - |
$3,155
70,121
kWh
|
- | |
| 04 | 2.9114: Use solar heat to make electricty | $193,096 | $2,257,766 |
$193,096
3,176,285
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $622 | $2,945 |
$622
13,833
kWh
|
- | |
| TOTAL RECOMMENDED | $286,290 | $2,553,348 |
$198,442
3,280,377
kWh
|
$87,848
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,396 | $17,637 |
$13,396
282,980
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs