Assessment Year | 2003 |
---|---|
Principal Product | Vinyl siding |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 3080: |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
443,000
ft2
|
Annual Production | 2,400
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $619,107 | 23,378,544 |
kWh
|
$0.026 |
Electricity Demand | $341,491 | 37,404 |
kW-mo/yr
|
$9.13 |
Electricity Fees | $32,246 | - |
|
- |
Natural Gas | $38,462 | 5,538 |
MMBtu
|
$6.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,524 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $7,357 | $1,650 |
$5,073
192,144
kWh
|
$2,284
-
kW-mo/yr
|
- | - | - | |
02 | 2.4151: Develop a repair/replace policy | $3,711 | $5,940 |
$2,560
96,983
kWh
|
$1,151
-
kW-mo/yr
|
- | - | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,070 | - |
$(-423.0)
(-16,000)
kWh
|
$(-190.0)
-
kW-mo/yr
|
$6,783
-
MMBtu
|
$(-100.0) | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,905 | $50 |
$4,763
180,432
kWh
|
$2,142
-
kW-mo/yr
|
- | - | - | |
05 | 2.7134: Use photocell controls | $4,513 | $2,750 |
$2,216
83,950
kWh
|
$2,297
-
kW-mo/yr
|
- | - | - | |
06 | 2.7131: Add area lighting switches | $3,306 | $1,200 |
$2,203
83,462
kWh
|
$1,103
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $887 | $862 |
$613
23,212
kWh
|
$274
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,879 | $1,740 |
$1,296
49,083
kWh
|
$583
-
kW-mo/yr
|
- | - | - | |
09 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,286 | $10,000 |
$13,286
606,375
kWh
|
- | - | - | - | |
10 | 2.2625: Chill water to the highest temperature possible | $2,785 | $12,240 |
$1,920
72,744
kWh
|
$865
-
kW-mo/yr
|
- | - | - | |
11 | 2.3113: Make ice during off peak hours for cooling | $3,651 | $38,000 |
$2,084
42,960
kWh
|
$2,897
-
kW-mo/yr
|
- | - |
$(-1,330.0)
-
Tgal
|
|
TOTAL RECOMMENDED | $54,350 | $74,432 |
$35,591
1,415,345
kWh
|
$13,406
-
kW-mo/yr
|
$6,783
-
MMBtu
|
$(-100.0) |
$(-1,330.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $23,524 | $22,482 |
$16,225
614,598
kWh
|
$7,299
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs