Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,525

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0084 #07 Y:2026 Pay bills on time to avoid late fees $16,942 -
MU0084 #06 Y:2026 Keep doors and windows shut when not on use $67 -
MU0084 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $205 $987
MU0084 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,615 $3,336
MU0084 #03 Y:2026 Install occupancy sensors $206 $1,222
MU0084 #02 Y:2026 Recover heat from exhausted steam, hot air or hot water $9,084 $9,725
MU0084 #01 Y:2026 Optimize plant power factor $74,251 $77,040
MU0083 #12 Y:2026 Pay bills on time to avoid late fees $1,478 -
MU0083 #11 Y:2026 Use proper thickness of insulation on building envelope $187 $556
MU0083 #10 Y:2026 Insulate glazing, walls, ceilings, and roofs $2,211 $4,353
MU0083 #09 Y:2026 Close holes and openings in building such as broken windows $56 $113
MU0083 #08 Y:2026 Install timers and/or thermostats $5,069 $1,095
MU0083 #07 Y:2026 Lower temperature during the winter season and vice-versa $14,336 -
MU0083 #06 Y:2026 Reschedule and rearrange multiple-source heating systems $4,945 -
MU0083 #05 Y:2026 Install occupancy sensors $233 $1,209
MU0083 #04 Y:2026 Eliminate or reduce compressed air usage $1,914 $1,793
MU0083 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $1,057 -
MU0083 #02 Y:2026 Reduce space conditioning during non-working hours $15,130 -
MU0083 #01 Y:2026 Recover heat from exhausted steam, hot air or hot water $23,488 $132,000
MU0082 #12 Y:2026 Pay bills on time to avoid late fees $1,092 -