ITAC Assessment: MUCM31
ITAC logo
ITAC Assessment: MUCM31
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product 0
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 7375: Information Retrieval Services
Sales Range less than $500
k
# of Employees 60
Plant Area 98,257
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,843 1,536,290
kWh
Electricity Demand $106,374 4,809
kW-mo/yr
Electricity Fees $16,030 -
Natural Gas $31,571 5,603
MMBtu
Waste Disposal Costs
Water Usage $21,985 1,256,339
Tgal
TOTAL YEARLY COSTS $312,803
RECOMMENDED SAVINGS* $30,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,778 $16,600 $4,862
54,624
kWh
$5,916
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $11,679 $7,763 - - - $11,679
03 2.1212: Operate boilers on high fire setting $405 $1,000 - - $405
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $313 $2,395 $106
1,190
kWh
- $207
-
MMBtu
-
05 2.7134: Use photocell controls $3,442 $3,932 $1,515
17,028
kWh
$1,927
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $986 $3,228 $433
4,867
kWh
$553
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,763 $485 $1,215
13,647
kWh
$1,548
-
kW-mo/yr
- -
TOTAL RECOMMENDED $30,366 $35,403 $8,131
91,356
kWh
$9,944
-
kW-mo/yr
$612
-
MMBtu
$11,679
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs