| Assessment Year | 2025 |
|---|---|
| Principal Product | beer and canned beverages |
| NAICS | 424810: Beer and Ale Merchant Wholesalers |
| SIC | 5181: Beer and Ale |
| Sales Range | $100 M to 500M |
| # of Employees | 180 |
| Plant Area |
165,000
ft2
|
| Annual Production | 5,200,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $70,818 | 1,149,845 |
kWh
|
$0.062 |
| Electricity Demand | $55,602 | 3,202 |
kW-mo/yr
|
$17.36 |
| Electricity Fees | $47,761 | - |
|
- |
| Natural Gas | $66,628 | 9,964 |
MMBtu
|
$6.69 |
| Other Gas | $5,689 | 1 |
MMBtu
|
$5,688.81 |
| TOTAL YEARLY COSTS | $246,497 | |||
| RECOMMENDED SAVINGS* | $29,688 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $11,904 | $500 |
$2,954
47,639
kWh
|
$2,683
-
kW-mo/yr
|
- |
$6,267
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,412 | $17,495 |
$796
12,838
kWh
|
$(-1,456.8)
-
kW-mo/yr
|
- |
$6,073
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $393 | $457 |
$284
4,608
kWh
|
$110
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17 | - |
$7
106
kWh
|
$11
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $168 | - |
$64
1,034
kWh
|
$104
-
kW-mo/yr
|
- | - | |
| 06 | 2.6218: Turn off equipment when not in use | $253 | - |
$97
1,560
kWh
|
$156
-
kW-mo/yr
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $1,846 | - |
$812
13,102
kWh
|
$1,034
-
kW-mo/yr
|
- | - | |
| 08 | 2.7261: Install timers and/or thermostats | $463 | $915 | - | - | - |
$463
-
MMBtu
|
|
| 09 | 2.7444: Close holes and openings in building such as broken windows | $9,018 | $112 |
$1,378
22,226
kWh
|
$2,227
-
kW-mo/yr
|
- |
$5,413
-
MMBtu
|
|
| 10 | 4.821: Pay bills on time to avoid late fees | $214 | - | - | - | $214 | - | |
| TOTAL RECOMMENDED | $29,688 | $19,479 |
$6,391
103,113
kWh
|
$4,867
-
kW-mo/yr
|
$214 |
$18,216
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs