Assessment Year | 2005 |
---|---|
Principal Product | plastic auto parts |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 560 |
Plant Area |
300,000
ft2
|
Annual Production | 17,000,000
pieces
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,421,618 | 16,990,642 |
kWh
|
$0.084 |
Electricity Demand | $240,082 | 34,277 |
kW-mo/yr
|
$7.00 |
Electricity Fees | $11,915 | - |
|
- |
LPG | $148,389 | 12,824 |
MMBtu
|
$11.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $203,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $91,824 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $98,511 | $312,103 |
$81,197
988,277
kWh
|
$17,314
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,163 | $86,315 |
$31,623
384,900
kWh
|
$5,540
-
kW-mo/yr
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $15,630 | $6,540 |
$(-955.0)
(-11,600)
kWh
|
$(-135.0)
-
kW-mo/yr
|
$16,720
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,153 | - |
$12,545
152,700
kWh
|
$1,608
-
kW-mo/yr
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,602 | $77,760 |
$19,482
237,125
kWh
|
$7,865
-
kW-mo/yr
|
$(-13,745.0)
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $7,599 | $2,010 |
$6,793
82,680
kWh
|
$806
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,815 | $7,660 |
$6,000
73,044
kWh
|
$815
-
kW-mo/yr
|
- | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $6,340 | $25,150 |
$6,340
77,330
kWh
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,540 | $800 |
$2,540
30,900
kWh
|
- | - | |
10 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,584 | $1,300 | - | - |
$1,584
-
MMBtu
|
|
TOTAL RECOMMENDED | $203,937 | $519,638 |
$165,565
2,015,356
kWh
|
$33,813
-
kW-mo/yr
|
$4,559
-
MMBtu
|
||
TOTAL IMPLEMENTED | $91,824 | $129,775 |
$64,886
789,954
kWh
|
$8,634
-
kW-mo/yr
|
$18,304
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs