Assessment Year | 1994 |
---|---|
Principal Product | Speed Reducing Gear Boxes |
NAICS |
n/a
|
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
205,600
ft2
|
Annual Production | 51,500
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $712,133 | 14,752,931 |
kWh
|
$0.048 |
Natural Gas | $23,747 | 4,283 |
MMBtu
|
$5.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,590 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,334 | $1,000 |
$15,334
319,461
kWh
|
|
02 | 2.7251: Reduce air conditioning load by evaporating water from roof | $10,859 | $13,300 |
$10,859
256,448
kWh
|
|
03 | 2.5121: Redesign flow to minimize mass transfer length | $11,508 | $5,200 |
$11,508
239,742
kWh
|
|
04 | 2.7261: Install timers and/or thermostats | $7,597 | $5,400 |
$7,597
158,265
kWh
|
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $8,005 | $360 |
$8,005
157,386
kWh
|
|
06 | 2.2511: Insulate bare equipment | $6,176 | $605 |
$6,176
128,664
kWh
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,013 | $200 |
$1,013
21,102
kWh
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $98 | $108 |
$98
2,052
kWh
|
|
TOTAL RECOMMENDED | $60,590 | $26,173 |
$60,590
1,283,120
kWh
|
||
TOTAL IMPLEMENTED | $16,445 | $1,308 |
$16,445
342,615
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs