ITAC Assessment: TN0518
ITAC logo
ITAC Assessment: TN0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Speed Reducing Gear Boxes
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 205,600
ft2
Annual Production 51,500
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $712,133 14,752,931
kWh
Natural Gas $23,747 4,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,334 $1,000 $15,334
319,461
kWh
02 2.7251: Reduce air conditioning load by evaporating water from roof $10,859 $13,300 $10,859
256,448
kWh
03 2.5121: Redesign flow to minimize mass transfer length $11,508 $5,200 $11,508
239,742
kWh
04 2.7261: Install timers and/or thermostats $7,597 $5,400 $7,597
158,265
kWh
05 2.7111: Reduce illumination to minimum necessary levels $8,005 $360 $8,005
157,386
kWh
06 2.2511: Insulate bare equipment $6,176 $605 $6,176
128,664
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,013 $200 $1,013
21,102
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $98 $108 $98
2,052
kWh
TOTAL RECOMMENDED $60,590 $26,173 $60,590
1,283,120
kWh
TOTAL IMPLEMENTED $16,445 $1,308 $16,445
342,615
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs