ITAC Assessment: MU0078
ITAC logo
ITAC Assessment: MU0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Custom Products
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 175,677
ft2
Annual Production 65
units
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,705 1,323,500
kWh
Electricity Demand $55,355 4,100
kW-mo/yr
Electricity Fees $18,948 -
Natural Gas $20,855 4,077
MMBtu
LPG $3,331 112
MMBtu
Other Gas $4,548 1
MMBtu
Waste Disposal Costs
Water Usage $5,179 1,206,000
Tgal
TOTAL YEARLY COSTS $165,920
RECOMMENDED SAVINGS* $26,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $12,550 $145,000 $(-616.1)
(-14,003)
kWh
$(-727.1)
-
kW-mo/yr
- $20,893
-
MMBtu
$(-7,000.0)
02 2.6125: Keep equipment clean $3,799 - $3,722
8,460
kWh
$76
-
kW-mo/yr
- - -
03 2.2211: Use optimum temperature $208 - $62
1,408
kWh
$146
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,235 $6,972 $819
18,613
kWh
$2,416
-
kW-mo/yr
- - -
05 2.6211: Conserve energy by efficient use of vending machines $1,299 $528 $786
17,868
kWh
$513
-
kW-mo/yr
- - -
06 2.7134: Use photocell controls $928 $4,410 $426
9,671
kWh
$502
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $1,410 $1,056 $365
8,302
kWh
$1,045
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $423 - $229
5,215
kWh
$193
-
kW-mo/yr
- - -
09 2.7492: Use proper thickness of insulation on building envelope $2,407 $6,214 $214
4,868
kWh
$358
-
kW-mo/yr
$1,835
-
MMBtu
- -
10 2.7496: Install partitions to reduce size of conditioned space $131 - - - $131
-
MMBtu
- -
TOTAL RECOMMENDED $26,390 $164,180 $6,008
60,402
kWh
$4,523
-
kW-mo/yr
$1,966
-
MMBtu
$20,893
-
MMBtu
$(-7,000.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs