ITAC Assessment: DS0038
ITAC logo
ITAC Assessment: DS0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Granite monuments and tiles
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 110,700
ft2
Annual Production 345,000
pieces
Production Hrs. Annual 2,280
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,456 4,361,372
kWh
Natural Gas $4,348 790
MMBtu
Fuel Oil #1 $11,921 2,556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $6,723 $28,139 $6,723
96,424
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,231 $200 $5,231
154,455
kWh
-
03 2.7231: Use radiant heater for spot heating $13,083 $12,000 $28,844
712,485
kWh
$(-15,761.0)
-
MMBtu
04 2.4321: Upgrade obsolete equipment $4,257 $950 $4,257
75,615
kWh
-
TOTAL RECOMMENDED $29,294 $41,289 $45,055
1,038,979
kWh
$(-15,761.0)
-
MMBtu
TOTAL IMPLEMENTED $25,037 $40,339 $40,798
963,364
kWh
$(-15,761.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs