ITAC Assessment: OR0521
ITAC logo
ITAC Assessment: OR0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product plywood
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $50
M
to 100
M
# of Employees 305
Plant Area 700,000
ft2
Annual Production 250,000
thousand feet
Production Hrs. Annual 7,300
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $918,488 25,923,000
kWh
Electricity Demand $212,010 55,500
kW-mo/yr
Electricity Fees $39,915 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $220,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.2127: Flash condensate to produce lower pressure steam $92,300 $44,300 - - $92,300
-
MMBtu
02 2.4131: Size electric motors for peak operating efficiency $37,000 $20,600 $37,000
157,200
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $27,300 - $27,300
658,400
kWh
- -
04 2.6218: Turn off equipment when not in use $27,800 $12,500 $27,800
78,840
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,600 $9,600 $9,600
225,200
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,300 - $7,300
170,500
kWh
- -
07 2.4224: Upgrade controls on compressors $7,100 $45,000 $6,185
176,700
kWh
$915
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,250 $9,300 $4,800
136,900
kWh
$450
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $3,720 $5,100 $3,600
102,044
kWh
$120
-
kW-mo/yr
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,600 $4,500 $1,600
45,900
kWh
- -
11 2.4322: Use or replace with energy efficient substitutes $1,900 $1,800 $1,900
38,000
kWh
- -
TOTAL RECOMMENDED $220,870 $152,700 $127,085
1,789,684
kWh
$1,485
-
kW-mo/yr
$92,300
-
MMBtu
TOTAL IMPLEMENTED $220,870 $152,700 $127,085
1,789,684
kWh
$1,485
-
kW-mo/yr
$92,300
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs