ITAC Assessment: OK0640
ITAC logo
ITAC Assessment: OK0640
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Brazing services and repair of aircraft exhaust
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 31,190
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,224 502,200
kWh
Electricity Fees $2,044 -
Natural Gas $28,246 4,231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,949 $690 n/a $9,149
116,863
kWh
- $(-200.0) -
02 2.6232: Install set-back timers $8,851 $996 n/a - $8,851
-
MMBtu
- -
03 2.7135: Install occupancy sensors $1,022 $214 n/a $1,022
12,776
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $583 $225 n/a $164
2,050
kWh
- $104 $315
TOTAL RECOMMENDED $19,405 $2,125 $10,335
131,689
kWh
$8,851
-
MMBtu
$(-96.0) $315
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs