ITAC Assessment: AS0440
ITAC logo
ITAC Assessment: AS0440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Injection molded plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 45,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 6,800
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,676 1,595,760
kWh
Electricity Demand $18,409 3,604
kW-mo/yr
Electricity Fees $483 -
Waste Disposal Costs
Water Usage $3,501 1,105
Tgal
Water Disposal $3,584 983
Tgal
Solid Waste (non-haz) $5,775 96,120
lb
TOTAL YEARLY COSTS $157,428
RECOMMENDED SAVINGS* $22,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,622 $15,120 $10,529
133,692
kWh
$1,093
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $315 $500 $289
3,673
kWh
$26
-
kW-mo/yr
03 2.5124: Use gravity feeds wherever possible $8,594 $13,600 $7,712
97,920
kWh
$882
-
kW-mo/yr
04 2.5123: Reduce fluid flow rates $892 $920 $840
10,666
kWh
$52
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $1,136 $100 $1,114
14,139
kWh
$22
-
kW-mo/yr
TOTAL RECOMMENDED $22,560 $30,240 $20,484
260,090
kWh
$2,076
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs