ITAC Assessment: GT0942
ITAC logo
ITAC Assessment: GT0942
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Cubed/Flaked Ice Making Machines
NAICS 333241: Food Product Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $100
M
to 500
M
# of Employees 523
Plant Area 220,000
ft2
Annual Production 78,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $675,857 7,719,000
kWh
Natural Gas $50,482 8,217
MMBtu
Waste Disposal Costs
Water Usage $281,257 29,451
Tgal
TOTAL YEARLY COSTS $1,007,596
RECOMMENDED SAVINGS* $331,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,845

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $20,227 $1,450 $20,227
229,857
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,618 $2,500 $15,618
177,478
kWh
- -
03 2.7141: Lower light fixtures in high ceiling areas $14,945 $4,781 $14,945
169,828
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $50,179 $71,763 $50,179
570,220
kWh
- -
05 3.4151: Minimize water usage $3,202 $5,700 $1,712
19,455
kWh
- $1,490
-
Tgal
06 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $113,048 $690,000 $164,736
1,872,000
kWh
$(-51,688.4)
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $114,607 $699,103 $114,607
1,308,931
kWh
- -
TOTAL RECOMMENDED $331,826 $1,475,297 $382,025
4,347,768
kWh
$(-51,688.4)
-
MMBtu
$1,490
-
Tgal
TOTAL IMPLEMENTED $35,845 $3,950 $35,845
407,335
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs