| Assessment Year | 2025 |
|---|---|
| Principal Product | Peptides |
| NAICS | 032541: Pharmaceutical and Medicine Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
40,000
ft2
|
| Annual Production | 2,646
lb
|
| Production Hrs. Annual | 7,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $936,700 | 3,333,375 |
kWh
|
$0.28 |
| Electricity Demand | $570,166 | 7,631 |
kW-mo/yr
|
$74.72 |
| Electricity Fees | $(-389,795.0) | - |
|
- |
| Natural Gas | $71,820 | 6,279 |
MMBtu
|
$11.44 |
| TOTAL YEARLY COSTS | $1,188,891 | |||
| RECOMMENDED SAVINGS* | $909,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $45,096 | $40,868 |
$21,210
75,480
kWh
|
$23,886
-
kW-mo/yr
|
- | |
| 02 | 2.3141: Use battery storage for demand control | $652,079 | $20,176 |
$(-52,280.8)
(-186,053)
kWh
|
$704,360
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,426 | $4,882 |
$9,005
32,046
kWh
|
$3,421
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,038 | - |
$6,038
21,486
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $259 | $339 |
$178
632
kWh
|
$81
-
kW-mo/yr
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $130,263 | $43,658 |
$89,476
318,422
kWh
|
$40,787
-
kW-mo/yr
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,439 | $6,700 |
$4,960
17,650
kWh
|
$3,479
-
kW-mo/yr
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,554 | $1,623 |
$3,815
13,577
kWh
|
$1,739
-
kW-mo/yr
|
- | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,761 | $2,117 |
$4,111
14,630
kWh
|
$2,650
-
kW-mo/yr
|
- | |
| 10 | 2.1221: Replace obsolete burners with more efficient ones | $4,061 | $10,319 | - | - |
$4,061
-
MMBtu
|
|
| 11 | 2.7234: Use heat pump for space conditioning | $33,554 | $29,800 |
$24,588
87,500
kWh
|
$8,966
-
kW-mo/yr
|
- | |
| 12 | 2.7135: Install occupancy sensors | $5,238 | $2,979 |
$3,795
13,507
kWh
|
$1,442
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $909,768 | $163,461 |
$114,895
408,878
kWh
|
$790,812
-
kW-mo/yr
|
$4,061
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs