ITAC Assessment: SD0673
ITAC logo
ITAC Assessment: SD0673
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Peptides
NAICS 032541: Pharmaceutical and Medicine Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 40,000
ft2
Annual Production 2,646
lb
Production Hrs. Annual 7,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $936,700 3,333,375
kWh
Electricity Demand $570,166 7,631
kW-mo/yr
Electricity Fees $(-389,795.0) -
Natural Gas $71,820 6,279
MMBtu
TOTAL YEARLY COSTS $1,188,891
RECOMMENDED SAVINGS* $882,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $45,096 $40,868 $21,210
75,480
kWh
$23,886
-
kW-mo/yr
-
02 2.3141: Use battery storage for demand control $652,079 $20,176 $(-52,280.8)
(-186,053)
kWh
$704,360
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,426 $4,882 $9,005
32,046
kWh
$3,421
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,038 - $6,038
21,486
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $259 $339 $178
632
kWh
$81
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $71,133 $43,658 $48,860
173,880
kWh
$22,273
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,892 $6,700 $38,153
135,777
kWh
$1,739
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,554 $1,623 $3,815
13,577
kWh
$1,739
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,761 $2,117 $4,111
14,630
kWh
$2,650
-
kW-mo/yr
-
10 2.1221: Replace obsolete burners with more efficient ones $4,061 $10,319 - - $4,061
-
MMBtu
11 2.7234: Use heat pump for space conditioning $33,554 $29,800 $24,588
87,500
kWh
$8,966
-
kW-mo/yr
-
12 2.7135: Install occupancy sensors $5,238 $2,979 $3,795
13,507
kWh
$1,442
-
kW-mo/yr
-
TOTAL RECOMMENDED $882,091 $163,461 $107,472
382,463
kWh
$770,558
-
kW-mo/yr
$4,061
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs