Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

836

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0241 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $650 $2,200
UU0241 #06 Y:2024 Insulate bare equipment $1,150 $3,710
UU0241 #05 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $2,300 $7,800
UU0241 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,030 $17,040
UU0241 #01 Y:2024 Purchase gas directly from a contract gas supplier $8,700 $12,200
UU0242 #09 Y:2024 Eliminate or reduce compressed air usage $12,487 $68,600
UU0242 #06 Y:2024 Replace existing chiller with high efficiency model $21,730 $82,100
UU0242 #05 Y:2024 Use cooling tower or economizer to replace chiller cooling $8,004 $11,422
UU0242 #02 Y:2024 Close off unneeded steam lines $10,220 $4,400
UU0245 #02 Y:2023 Improve air circulation with destratification fans / other methods $5,693 $25,330
UU0244 #04 Y:2023 Lower temperature during the winter season and vice-versa $307 $460
UU0244 #03 Y:2023 Install isolation transformer on adjustable frequency drive $370 $264
UU0244 #02 Y:2023 Reduce temperature of process equipment when on standby $3,681 $3,450
UU0244 #01 Y:2023 Reduce space conditioning during non-working hours $3,850 $2,400
UU0243 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,244 $14,145
UU0243 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,631 $22,338
UU0243 #02 Y:2023 Use power during off-peak periods $15,800 $13,000
UU0240 #01 Y:2023 Use cooling tower water instead of refrigeration $10,047 $10,320
UU0237 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $2,040 $375
UU0239 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $3,011 $3,011