Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

846

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0251 #08 Y:2024 Reduce the pressure of compressed air to the minimum required $180 $300
UU0251 #07 Y:2024 Replace fossil fuel equipment with electrical equipment $2,290 $5,750
UU0251 #04 Y:2024 Recover waste heat from equipment $9,830 $19,570
UU0251 #03 Y:2024 Purchase gas directly from a contract gas supplier $23,190 $1,500
UU0253 #05 Y:2024 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $150 $450
UU0253 #01 Y:2024 Ventilation system to shut off when room is not in use $26,630 $43,200
UU0250 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $18,742 $49,723
UU0246 #07 Y:2024 Use automatic flow control $4,727 $4,633
UU0246 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $439 $900
UU0249 #03 Y:2024 Improve air circulation with destratification fans / other methods $3,461 $15,246
UU0241 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $650 $2,200
UU0241 #06 Y:2024 Insulate bare equipment $1,150 $3,710
UU0241 #05 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $2,300 $7,800
UU0241 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,030 $17,040
UU0241 #01 Y:2024 Purchase gas directly from a contract gas supplier $8,700 $12,200
UU0242 #09 Y:2024 Eliminate or reduce compressed air usage $12,487 $68,600
UU0242 #06 Y:2024 Replace existing chiller with high efficiency model $21,730 $82,100
UU0242 #05 Y:2024 Use cooling tower or economizer to replace chiller cooling $8,004 $11,422
UU0242 #02 Y:2024 Close off unneeded steam lines $10,220 $4,400
UU0245 #02 Y:2023 Improve air circulation with destratification fans / other methods $5,693 $25,330