865
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0262 #05 Y:2024 | 05 | 2024 | Use or replace with energy efficient substitutes | $762 | $2,640 | |
UU0262 #02 Y:2024 | 02 | 2024 | Use waste heat to produce steam to drive a steam turbine-generator | $14,276 | $180,000 | |
UU0262 #01 Y:2024 | 01 | 2024 | Use waste heat steam for absorption refrigeration | $12,361 | $217,800 | |
UU0260 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $2,557 | $6,277 | |
UU0260 #03 Y:2024 | 03 | 2024 | Eliminate or reduce compressed air usage | $4,696 | $8,277 | |
UU0260 #02 Y:2024 | 02 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $10,585 | $5,800 | |
UU0260 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $27,825 | $247,680 | |
UU0261 #06 Y:2024 | 06 | 2024 | Use or replace with energy efficient substitutes | $400 | $5,940 | |
UU0261 #02 Y:2024 | 02 | 2024 | Replace existing hvac unit with high efficiency model | $2,592 | $37,200 | |
UU0258 #08 Y:2024 | 08 | 2024 | Change rate schedules or other changes in utility service | $180,000 | $20,000 | |
UU0258 #06 Y:2024 | 06 | 2024 | Install compressor air intakes in coolest locations | $2,570 | $5,140 | |
UU0258 #04 Y:2024 | 04 | 2024 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,690,000 | $23,500,000 | |
UU0258 #01 Y:2024 | 01 | 2024 | Install smaller boiler (increase high fire duty cycle) | $158,000 | $725,000 | |
UU0259 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $221,450 | $2,473,450 | |
UU0259 #01 Y:2024 | 01 | 2024 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $3,866,540 | $17,885,484 | |
UU0257 #01 Y:2024 | 01 | 2024 | Recover heat from exhausted steam, hot air or hot water | $9,024 | $16,577 | |
UU0256 #03 Y:2024 | 03 | 2024 | Use heat from boiler blowdown to preheat boiler feed water | $8,048 | $11,730 | |
UU0256 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $14,319 | $31,625 | |
UU0254 #01 Y:2024 | 01 | 2024 | Turn off equipment when not in use | $1,358 | $5,447 | |
UU0251 #08 Y:2024 | 08 | 2024 | Reduce the pressure of compressed air to the minimum required | $180 | $300 |