Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

933

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0287 #09 Y:2025 Insulate bare equipment $3,100 $5,260
UU0287 #05 Y:2025 Use solar heat to make electricty $32,200 $261,000
UU0287 #04 Y:2025 Use plant owned transformers or lease transformers $7,500 $10,500
UU0287 #03 Y:2025 Change rate schedules or other changes in utility service $16,300 $2,160
UU0287 #02 Y:2025 Use demand controller or load shedder $40,400 $39,000
UU0287 #01 Y:2025 Use battery storage for demand control $54,000 $20,000
UU0284 #02 Y:2025 Replace existing chiller with high efficiency model $9,414 $47,500
UU0290 #04 Y:2025 Use solar heat to make electricty $15,860 $186,580
UU0290 #02 Y:2025 Use radiant heater for spot heating $2,009 $9,880
UU0278 #05 Y:2025 Utilize a less expensive cooling method $1,117 $3,600
UU0278 #04 Y:2025 Reduce ventilation air $8,620 $16,080
UU0278 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,000 $16,200
UU0278 #02 Y:2025 Replace boiler $12,650 $52,800
UU0278 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,355 $10,800
UU0283 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,935 $8,525
UU0283 #01 Y:2025 Use solar heat to make electricty $18,866 $217,875
UU0282 #10 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,520 $9,240
UU0282 #09 Y:2025 Air condition only space necessary $1,130 $2,230
UU0282 #08 Y:2025 Insulate bare equipment $3,030 $15,460
UU0282 #07 Y:2025 Turn off equipment when not in use $9,350 $3,000