ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0241 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $650 | $2,200 | |
UU0241 #06 Y:2024 | 06 | 2024 | Insulate bare equipment | $1,150 | $3,710 | |
UU0241 #05 Y:2024 | 05 | 2024 | Use waste heat from hot flue gases to preheat incoming fluids | $2,300 | $7,800 | |
UU0241 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $8,030 | $17,040 | |
UU0241 #01 Y:2024 | 01 | 2024 | Purchase gas directly from a contract gas supplier | $8,700 | $12,200 | |
UU0242 #09 Y:2024 | 09 | 2024 | Eliminate or reduce compressed air usage | $12,487 | $68,600 | |
UU0242 #06 Y:2024 | 06 | 2024 | Replace existing chiller with high efficiency model | $21,730 | $82,100 | |
UU0242 #05 Y:2024 | 05 | 2024 | Use cooling tower or economizer to replace chiller cooling | $8,004 | $11,422 | |
UU0242 #02 Y:2024 | 02 | 2024 | Close off unneeded steam lines | $10,220 | $4,400 | |
UU0245 #02 Y:2023 | 02 | 2023 | Improve air circulation with destratification fans / other methods | $5,693 | $25,330 | |
UU0244 #04 Y:2023 | 04 | 2023 | Lower temperature during the winter season and vice-versa | $307 | $460 | |
UU0244 #03 Y:2023 | 03 | 2023 | Install isolation transformer on adjustable frequency drive | $370 | $264 | |
UU0244 #02 Y:2023 | 02 | 2023 | Reduce temperature of process equipment when on standby | $3,681 | $3,450 | |
UU0244 #01 Y:2023 | 01 | 2023 | Reduce space conditioning during non-working hours | $3,850 | $2,400 | |
UU0243 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $3,244 | $14,145 | |
UU0243 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $4,631 | $22,338 | |
UU0243 #02 Y:2023 | 02 | 2023 | Use power during off-peak periods | $15,800 | $13,000 | |
UU0240 #01 Y:2023 | 01 | 2023 | Use cooling tower water instead of refrigeration | $10,047 | $10,320 | |
UU0237 #06 Y:2023 | 06 | 2023 | Reduce the pressure of compressed air to the minimum required | $2,040 | $375 | |
UU0239 #06 Y:2023 | 06 | 2023 | Reduce the pressure of compressed air to the minimum required | $3,011 | $3,011 |