ITAC Assessment: UU0278
ITAC logo
ITAC Assessment: UU0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Library
NAICS 519120: Libraries and Archives
SIC 8231: Libraries
Sales Range less than $500
k
# of Employees 20
Plant Area 94,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,768
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,780 1,358,800
kWh
Electricity Demand $54,690 3,759
kW-mo/yr
Electricity Fees $7,440 -
Natural Gas $60,000 5,130
MMBtu
TOTAL YEARLY COSTS $184,910
RECOMMENDED SAVINGS* $32,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,355 $10,800 $4,435
96,000
kWh
$1,920
-
kW-mo/yr
-
02 2.1224: Replace boiler $12,650 $52,800 - - $12,650
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,000 $16,200 $1,920
42,240
kWh
$2,080
-
kW-mo/yr
-
04 2.7314: Reduce ventilation air $8,620 $16,080 $6,830
147,800
kWh
- $1,790
-
MMBtu
05 2.2628: Utilize a less expensive cooling method $1,117 $3,600 $850
18,380
kWh
$267
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,742 $99,480 $14,035
304,420
kWh
$4,267
-
kW-mo/yr
$14,440
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs