3,682
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NT0020 #07 Y:2023 | 07 | 2023 | Replace existing hvac unit with high efficiency model | $113,865 | $96,040 | |
NT0020 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $27,816 | $16,551 | |
NT0020 #04 Y:2023 | 04 | 2023 | Insulate bare equipment | $3,147 | $11,909 | |
NT0020 #03 Y:2023 | 03 | 2023 | Utilize higher efficiency lamps and/or ballasts | $33,277 | $33,920 | |
TR0047 #03 Y:2023 | 03 | 2023 | Use solar heat to make electricty | $62,860 | $264,693 | |
AM0891 #06 Y:2023 | 06 | 2023 | Use synthetic lubricant | $340 | $980 | |
AM0891 #05 Y:2023 | 05 | 2023 | Install occupancy sensors | $525 | $390 | |
NT0019 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,487 | $4,553 | |
NT0019 #04 Y:2023 | 04 | 2023 | Apply for investment incentives | $12,574 | - | |
NT0019 #03 Y:2023 | 03 | 2023 | Optimize plant power factor | $36,036 | $9,814 | |
NT0019 #02 Y:2023 | 02 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $17,486 | $33,471 | |
NT0019 #01 Y:2023 | 01 | 2023 | Insulate bare equipment | $60,556 | $294,320 | |
NT0018 #09 Y:2023 | 09 | 2023 | Utilize higher efficiency lamps and/or ballasts | $2,092 | $5,443 | |
NT0018 #08 Y:2023 | 08 | 2023 | Lower temperature during the winter season and vice-versa | $1,056 | - | |
NT0018 #07 Y:2023 | 07 | 2023 | Purchase equipment instead of leasing | $45,600 | $27,500 | |
NT0018 #06 Y:2023 | 06 | 2023 | Optimize plant power factor | $8,460 | $6,082 | |
NT0018 #05 Y:2023 | 05 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,528 | - | |
NT0018 #03 Y:2023 | 03 | 2023 | Insulate bare equipment | $1,450 | $1,311 | |
NT0018 #02 Y:2023 | 02 | 2023 | Analyze flue gas for proper air/fuel ratio | $35,653 | $1,258 | |
NT0018 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,361 | $4,553 |