ITAC Assessment: NT0040
ITAC logo
ITAC Assessment: NT0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Coated Linerboard
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 40,000
ft2
Annual Production 33,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,043 2,196,186
kWh
Electricity Demand $43,101 5,699
kW-mo/yr
Electricity Fees $3,901 -
Natural Gas $20,778 5,667
MMBtu
Waste Disposal Costs
Water Usage $75,072 16,616
Tgal
TOTAL YEARLY COSTS $215,895
RECOMMENDED SAVINGS* $163,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,238 - $862
25,877
kWh
$376
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,568 $5,609 $1,788
53,679
kWh
$780
-
kW-mo/yr
- -
03 4.431: Train operators for maximum operating efficiency $150,000 $12,000 - - - $150,000
04 2.3212: Optimize plant power factor $6,649 $5,965 - - $6,649 -
05 4.812: Apply for investment incentives $3,165 $5,000 - - $3,165 -
TOTAL RECOMMENDED $163,620 $28,573 $2,649
79,555
kWh
$1,157
-
kW-mo/yr
$9,814 $150,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs