ITAC Assessment: NT0033
ITAC logo
ITAC Assessment: NT0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cardboard Box
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 289,000
ft2
Annual Production 29,803
ton
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,747 5,307,550
kWh
Electricity Demand $101,013 11,507
kW-mo/yr
Electricity Fees $10,752 -
Waste Disposal Costs
Water Usage $62,938 3,184
Tgal
TOTAL YEARLY COSTS $393,450
RECOMMENDED SAVINGS* $162,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,068 $5,609 $2,630
63,844
kWh
$1,437
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $732 - $474
11,496
kWh
$259
-
kW-mo/yr
- -
03 2.7224: Reduce space conditioning during non-working hours $309 $403 $309
7,498
kWh
- - -
04 4.812: Apply for investment incentives $7,104 $10,000 - - $7,104 -
05 4.652: Replace existing equipment with more suitable substitutes $150,000 $200,000 - - - $150,000
TOTAL RECOMMENDED $162,213 $216,012 $3,413
82,838
kWh
$1,696
-
kW-mo/yr
$7,104 $150,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs