ITAC Assessment: OK1073
ITAC logo
ITAC Assessment: OK1073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Rubber belts for agricultural machinery
NAICS 333613: Mechanical Power Transmission Equipment Manufacturing
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 120,000
ft2
Annual Production 8,282,486
lb
Production Hrs. Annual 7,488
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,167 4,763,332
kWh
Electricity Demand $255,010 11,806
kW-mo/yr
Electricity Fees $2,964 -
Natural Gas $457,887 167,724
MMBtu
Waste Disposal Costs
Water Usage $205,361 26,028
Tgal
TOTAL YEARLY COSTS $1,159,389
RECOMMENDED SAVINGS* $63,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $32,771 $39,489 - - $32,771
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,548 $12,334 $10,548
210,961
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,161 $9,927 $9,567
191,338
kWh
$5,594
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,707 $1,176 $3,707
74,131
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $1,129 - $1,129
22,576
kWh
- -
TOTAL RECOMMENDED $63,316 $62,926 $24,951
499,006
kWh
$5,594
-
kW-mo/yr
$32,771
TOTAL IMPLEMENTED $19,997 $11,103 $14,403
288,045
kWh
$5,594
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs