ITAC Assessment: NT0032
ITAC logo
ITAC Assessment: NT0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Sucker Rod
NAICS 213112: Support Activities for Oil and Gas Operations
SIC 1389: Oil and Gas Field Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 360,000
ft2
Annual Production 240,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,582 5,462,700
kWh
Electricity Demand $277,809 19,204
kW-mo/yr
Electricity Fees $38,359 -
Natural Gas $329,073 563,430
MMBtu
Waste Disposal Costs
Water Usage $29,366 1,551
Tgal
TOTAL YEARLY COSTS $1,024,189
RECOMMENDED SAVINGS* $37,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,842 $5,609 $4,859
75,924
kWh
$2,983
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $24,030 - $14,890
232,658
kWh
$9,140
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $1,332 - $1,332
20,661
kWh
- -
04 4.812: Apply for investment incentives $1,001 $2,500 - - $1,001
05 2.7135: Install occupancy sensors $2,831 $2,669 $2,162
33,775
kWh
$669
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,036 $10,778 $23,243
363,019
kWh
$12,792
-
kW-mo/yr
$1,001
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs