Assessment Year | 2005 |
---|---|
Principal Product | Tomato Based Sauces & Salsas |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
265,580
ft2
|
Annual Production | 22,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,165 | 11,202,600 |
kWh
|
$0.013 |
Electricity Demand | $82,453 | 20,613 |
kW-mo/yr
|
$4.00 |
Natural Gas | $1,602,463 | 233,097 |
MMBtu
|
$6.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $371,581 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $262,635 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,971 | - |
$4,185
321,931
kWh
|
$1,786
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,139 | $1,148 |
$2,911
223,905
kWh
|
$1,228
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,234 | $1,352 |
$2,274
174,937
kWh
|
$960
-
kW-mo/yr
|
- | - | |
04 | 2.2425: Use flue gases to heat process or service water | $255,262 | $207,240 |
$(-749.0)
(-57,641)
kWh
|
$(-316.0)
-
kW-mo/yr
|
$256,327
-
MMBtu
|
- | |
05 | 2.2628: Utilize a less expensive cooling method | $102,975 | $200,000 | n/a |
$(-31,089.0)
(-2,391,480)
kWh
|
$(-13,104.0)
-
kW-mo/yr
|
- |
$147,168
-
Tgal
|
TOTAL RECOMMENDED | $371,581 | $409,740 |
$(-22,468.0)
(-1,728,348)
kWh
|
$(-9,446.0)
-
kW-mo/yr
|
$256,327
-
MMBtu
|
$147,168
-
Tgal
|
||
TOTAL IMPLEMENTED | $262,635 | $209,740 |
$4,436
341,201
kWh
|
$1,872
-
kW-mo/yr
|
$256,327
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs