ITAC Assessment: NT0034
ITAC logo
ITAC Assessment: NT0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Galvanized steel products
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 26,800
ft2
Annual Production 53,413,636
units
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,791 612,813
kWh
Electricity Demand $17,938 1,890
kW-mo/yr
Electricity Fees $3,169 -
Natural Gas $173,059 88,919
MMBtu
Waste Disposal Costs
Water Usage $12,124 681
Tgal
TOTAL YEARLY COSTS $229,080
RECOMMENDED SAVINGS* $43,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $131 $414 $60
1,615
kWh
$71
-
kW-mo/yr
- - -
02 2.7224: Reduce space conditioning during non-working hours $249 - $249
6,683
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,040 $1,056 $698
18,754
kWh
$342
-
kW-mo/yr
- - -
04 2.4322: Use or replace with energy efficient substitutes $4,552 $19,950 $2,666
71,679
kWh
$1,886
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,461 $1,258 - - - $3,461
-
MMBtu
-
06 4.812: Apply for investment incentives $3,553 $5,000 - - $3,553 - -
07 4.132: Purchase new equipment to reduce material use / cost $30,115 $80,000 - - - $865
-
MMBtu
$29,250
TOTAL RECOMMENDED $43,100 $107,678 $3,673
98,731
kWh
$2,299
-
kW-mo/yr
$3,553 $4,326
-
MMBtu
$29,250
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs