ITAC Assessment: UD0990
ITAC logo
ITAC Assessment: UD0990
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $100
M
to 500
M
# of Employees 169
Plant Area 300,000
ft2
Annual Production 72,610
ton
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $526,834 6,668,779
kWh
Electricity Demand $3,142 26,517
kW-mo/yr
Electricity Fees $74,845 -
Natural Gas $18,695 2,807
MMBtu
Waste Disposal Costs
Water Usage $7,874 699
Tgal
Water Disposal $8,285 699
Tgal
TOTAL YEARLY COSTS $639,673
RECOMMENDED SAVINGS* $133,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,680 $4,200 $5,858
74,153
kWh
- - - - $2,822
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $574 $1,000 $8,486
107,424
kWh
- - - $(-12,000.0) $4,088
03 2.3212: Optimize plant power factor $72,351 $48,000 - - $72,351 - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $7,458 $400 - - - $7,458
-
Tgal
- -
05 2.4151: Develop a repair/replace policy $2,774 $10,470 $2,766
35,008
kWh
$8
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $41,379 $200,263 $41,254
522,200
kWh
$125
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $133,216 $264,333 $58,364
738,785
kWh
$133
-
kW-mo/yr
$72,351 $7,458
-
Tgal
$(-12,000.0) $6,910
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs