Assessment Year | 2018 |
---|---|
Principal Product | Tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $100 M to 500M |
# of Employees | 169 |
Plant Area |
300,000
ft2
|
Annual Production | 72,610
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $526,834 | 6,668,779 |
kWh
|
$0.079 | |
Electricity Demand | $3,142 | 26,517 |
kW-mo/yr
|
$0.12 | |
Electricity Fees | $74,845 | - |
|
- | |
Natural Gas | $18,695 | 2,807 |
MMBtu
|
$6.66 | |
Waste Disposal Costs | |||||
Water Usage | $7,874 | 699 |
Tgal
|
$11.27 | |
Water Disposal | $8,285 | 699 |
Tgal
|
$11.86 | |
TOTAL YEARLY COSTS | $639,673 | ||||
RECOMMENDED SAVINGS* | $133,216 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,680 | $4,200 |
$5,858
74,153
kWh
|
- | - | - | - | $2,822 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $574 | $1,000 |
$8,486
107,424
kWh
|
- | - | - | $(-12,000.0) | $4,088 | |
03 | 2.3212: Optimize plant power factor | $72,351 | $48,000 | - | - | $72,351 | - | - | - | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $7,458 | $400 | - | - | - |
$7,458
-
Tgal
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $2,774 | $10,470 |
$2,766
35,008
kWh
|
$8
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,379 | $200,263 |
$41,254
522,200
kWh
|
$125
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $133,216 | $264,333 |
$58,364
738,785
kWh
|
$133
-
kW-mo/yr
|
$72,351 |
$7,458
-
Tgal
|
$(-12,000.0) | $6,910 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs