ITAC Assessment: TA0129
ITAC logo
ITAC Assessment: TA0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Tricone Drill Bits
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 80,000
ft2
Annual Production 13,000
units
Production Hrs. Annual 8,472
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $641,458 7,134,234
kWh
Electricity Demand $119,457 16,687
kW-mo/yr
Natural Gas $26,569 28,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,250 $1,944 $2,015
27,808
kWh
$235
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,372 - $5,708
78,790
kWh
$664
-
kW-mo/yr
-
03 2.7442: Keep doors and windows shut when not on use $10,615 - $10,615
146,540
kWh
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $940 $300 $940
12,983
kWh
- -
05 2.8121: Apply for tax-free status for energy purchases $48,887 - - - $48,887
TOTAL RECOMMENDED $69,064 $2,244 $19,278
266,121
kWh
$899
-
kW-mo/yr
$48,887
TOTAL IMPLEMENTED $61,752 $1,944 $12,630
174,348
kWh
$235
-
kW-mo/yr
$48,887
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs