ITAC Assessment: OR0604
ITAC logo
ITAC Assessment: OR0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Carbon Materials
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 76,000
ft2
Annual Production 600,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,791 2,049,320
kWh
Electricity Demand $72,356 9,196
kW-mo/yr
Electricity Fees $12,011 -
Natural Gas $71,310 11,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,862

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,634 $500 $7,804
144,189
kWh
$830
-
kW-mo/yr
-
02 2.1116: Improve combustion control capability $144,955 $110,000 - - $144,955
-
MMBtu
03 2.2437: Recover waste heat from equipment $53,512 $43,218 - - $53,512
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $13,502 $5,712 $11,209
207,194
kWh
$2,293
-
kW-mo/yr
-
05 2.4224: Upgrade controls on compressors $11,228 $11,850 $9,715
179,509
kWh
$1,513
-
kW-mo/yr
-
TOTAL RECOMMENDED $231,831 $171,280 $28,728
530,892
kWh
$4,636
-
kW-mo/yr
$198,467
-
MMBtu
TOTAL IMPLEMENTED $19,862 $12,350 $17,519
323,698
kWh
$2,343
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs