ITAC Assessment: NT0037
ITAC logo
ITAC Assessment: NT0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Linerboard
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 35,500
ft2
Annual Production 275,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,146,315 34,561,497
kWh
Electricity Demand $454,047 57,624
kW-mo/yr
Electricity Fees $56,326 -
Natural Gas $1,981,276 539,229
MMBtu
Waste Disposal Costs
Water Usage $1,426,262 315,698
Tgal
TOTAL YEARLY COSTS $5,064,228
RECOMMENDED SAVINGS* $103,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $577 $1,901 $435
13,104
kWh
$142
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,403 $5,609 $1,812
54,608
kWh
$591
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,316 - $4,009
120,757
kWh
$1,307
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $482 - $204
6,126
kWh
$278
-
kW-mo/yr
-
05 4.812: Apply for investment incentives $94,336 $5,000 - - $94,336
TOTAL RECOMMENDED $103,115 $12,510 $6,460
194,596
kWh
$2,319
-
kW-mo/yr
$94,336
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs