Assessment Year | 2025 |
---|---|
Principal Product | Linerboard |
NAICS | 322130: Paperboard Mills |
SIC | 2631: Paperboard Mills |
Sales Range | $100 M to 500M |
# of Employees | 160 |
Plant Area |
35,500
ft2
|
Annual Production | 275,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,146,315 | 34,561,497 |
kWh
|
$0.033 | |
Electricity Demand | $454,047 | 57,624 |
kW-mo/yr
|
$7.88 | |
Electricity Fees | $56,326 | - |
|
- | |
Natural Gas | $1,981,276 | 539,229 |
MMBtu
|
$3.67 | |
Waste Disposal Costs | |||||
Water Usage | $1,426,262 | 315,698 |
Tgal
|
$4.52 | |
TOTAL YEARLY COSTS | $5,064,228 | ||||
RECOMMENDED SAVINGS* | $103,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $577 | $1,901 |
$435
13,104
kWh
|
$142
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,403 | $5,609 |
$1,812
54,608
kWh
|
$591
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,316 | - |
$4,009
120,757
kWh
|
$1,307
-
kW-mo/yr
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $482 | - |
$204
6,126
kWh
|
$278
-
kW-mo/yr
|
- | |
05 | 4.812: Apply for investment incentives | $94,336 | $5,000 | - | - | $94,336 | |
TOTAL RECOMMENDED | $103,115 | $12,510 |
$6,460
194,596
kWh
|
$2,319
-
kW-mo/yr
|
$94,336 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs