Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0077 #05 Y:2023 Reduce space conditioning during non-working hours $1,997 $470
NL0077 #03 Y:2023 Recharge batteries on during off-peak demand periods $36,689 $350
NL0077 #01 Y:2023 Replace old machine with new automatic multi-station tool $150,762 $690,000
NL0062 #06 Y:2021 Install compressor air intakes in coolest locations $1,261 $918
NL0062 #05 Y:2021 Recover and reuse waste material $1,313 $440
NL0062 #01 Y:2021 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $45,354 $242,300
NL0042 #08 Y:2019 Install occupancy sensors $214 $1,050
NL0042 #07 Y:2019 Combine utility meters $565 $1,250
NL0042 #06 Y:2019 Use demand controller or load shedder $2,989 $2,400
NL0042 #04 Y:2019 Optimize plant power factor $3,805 $19,000
NL0042 #03 Y:2019 Change rate schedules or other changes in utility service $10,000 $800
NL0042 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $18,799 $15,889
NL0036 #05 Y:2019 Install occupancy sensors $674 $4,353
NL0035 #02 Y:2019 Improve air circulation with destratification fans / other methods $16,935 $18,980
NL0023 #04 Y:2018 Meter waste water $320 -
NL0023 #02 Y:2018 Reschedule plant operations or reduce load to avoid peaks $8,100 -
IA0563 #05 Y:2016 Direct warmest air to combustion intake $1,962 $4,050
IA0563 #02 Y:2016 Insulate bare equipment $8,696 $7,568
IA0559 #05 Y:2016 Install compressor air intakes in coolest locations $774 $660
IA0559 #04 Y:2016 Reduce the pressure of compressed air to the minimum required $673 $30