ITAC Assessment: NL0035
ITAC logo
ITAC Assessment: NL0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Mining Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 210,000
ft2
Annual Production 408
units
Production Hrs. Annual 4,966
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,187 1,876,600
kWh
Electricity Demand $105,725 8,084
kW-mo/yr
Electricity Fees $960 -
Natural Gas $59,012 11,689
MMBtu
Waste Disposal Costs
Water Usage $463 153
Tgal
Water Disposal $1,287 153
Tgal
TOTAL YEARLY COSTS $240,633
RECOMMENDED SAVINGS* $65,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,867

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,555 $34,820 $20,545
525,249
kWh
$16,010
-
kW-mo/yr
- - - -
02 2.7243: Improve air circulation with destratification fans / other methods $16,935 $18,980 $(-597.0)
(-15,308)
kWh
$(-468.0)
-
kW-mo/yr
- - - $18,000
03 2.4226: Use / purchase optimum sized compressor $8,170 $35,828 $3,572
91,581
kWh
$4,598
-
kW-mo/yr
- - - -
04 2.8114: Change rate schedules or other changes in utility service $1,867 - - - - - $1,867 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,450 $1,600 $1,670
42,850
kWh
- $(-120.0) $(-100.0) - -
06 2.4221: Install compressor air intakes in coolest locations $825 $2,025 $825
21,159
kWh
- - - - -
TOTAL RECOMMENDED $65,802 $93,253 $26,015
665,531
kWh
$20,140
-
kW-mo/yr
$(-120.0) $(-100.0) $1,867 $18,000
TOTAL IMPLEMENTED $48,867 $74,273 $26,612
680,839
kWh
$20,608
-
kW-mo/yr
$(-120.0) $(-100.0) $1,867 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs