ITAC Assessment: NL0062
ITAC logo
ITAC Assessment: NL0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 250,000
ft2
Annual Production 3,358,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,329 5,481,629
kWh
Electricity Demand $74,910 10,394
kW-mo/yr
Electricity Fees $1,320 -
Natural Gas $37,429 6,727
MMBtu
Waste Disposal Costs
Water Usage $6,990 1,032
Tgal
TOTAL YEARLY COSTS $580,977
RECOMMENDED SAVINGS* $63,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $45,354 $242,300 $13,632
162,280
kWh
$5,946
-
kW-mo/yr
$25,776
-
MMBtu
- -
02 3.1191: Change procedures / equipment / operating conditions $9,581 $24,336 - - - - $9,581
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,498 $18,517 $3,762
44,781
kWh
$736
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,413 $660 $1,413
16,842
kWh
- - - -
05 3.5311: Recover and reuse waste material $1,313 $440 - - - $1,313
-
lb
-
06 2.4221: Install compressor air intakes in coolest locations $1,261 $918 $1,261
15,007
kWh
- - - -
07 2.7229: Air condition only space necessary $424 $50,000 $424
5,040
kWh
- - - -
TOTAL RECOMMENDED $63,843 $337,171 $20,491
243,950
kWh
$6,682
-
kW-mo/yr
$25,776
-
MMBtu
$1,313
-
lb
$9,581
TOTAL IMPLEMENTED $15,915 $93,513 $5,598
66,663
kWh
$736
-
kW-mo/yr
- - $9,581
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs