ITAC Assessment: TN0213
ITAC logo
ITAC Assessment: TN0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product METAL & PLASTIC COMPONENTS
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 4
Plant Area
n/a
Annual Production 6,500
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,753 92,028
kWh
Natural Gas $3,313 561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $375 $1,240 $375
9,379
kWh
-
02 2.6124: Establish equipment maintenance schedule $228 - - $228
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $35 - $35
879
kWh
-
TOTAL RECOMMENDED $638 $1,240 $410
10,258
kWh
$228
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs