ITAC Assessment: NL0077
ITAC logo
ITAC Assessment: NL0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Excavation and Mining Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 360,000
ft2
Annual Production 95
units
Production Hrs. Annual 6,864
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,483 5,222,750
kWh
Electricity Demand $197,992 15,736
kW-mo/yr
Electricity Fees $31,402 -
Natural Gas $213,415 60,103
MMBtu
Waste Disposal Costs
Water Usage $12,802 2,032
Tgal
Water Disposal $13,818 2,032
Tgal
TOTAL YEARLY COSTS $763,911
RECOMMENDED SAVINGS* $319,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.112: Replace old machine with new automatic multi-station tool $150,762 $690,000 $(-1,129.0)
(-20,160)
kWh
- - $4,200 - - $147,691
02 4.431: Train operators for maximum operating efficiency $121,895 $4,200 - - - $9,435 $116,660 $(-4,200.0) -
03 2.3132: Recharge batteries on during off-peak demand periods $36,689 $350 - $36,689
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,279 $4,500 $7,939
141,768
kWh
- - $(-560.0) $(-100.0) - -
05 2.7224: Reduce space conditioning during non-working hours $1,997 $470 - - $1,997
-
MMBtu
- - - -
06 2.7444: Close holes and openings in building such as broken windows $527 $200 - - $527
-
MMBtu
- - - -
TOTAL RECOMMENDED $319,149 $699,720 $6,810
121,608
kWh
$36,689
-
kW-mo/yr
$2,524
-
MMBtu
$13,075 $116,560 $(-4,200.0) $147,691
TOTAL IMPLEMENTED $129,701 $8,900 $7,939
141,768
kWh
- $527
-
MMBtu
$8,875 $116,560 $(-4,200.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs