ITAC Assessment: SD0387
ITAC logo
ITAC Assessment: SD0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Heart Valves
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range greater than $500
M
# of Employees 1,900
Plant Area 500,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,251,593 16,894,405
kWh
Electricity Demand $658,862 40,413
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $104,355 $91,000 $90,191
1,217,160
kWh
$14,164
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $1,871 $4,125 - - $1,871
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,616 $3,786 $1,029
13,889
kWh
$587
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $445 $1,000 - $445
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $900 $2,690 $574
7,756
kWh
$326
-
kW-mo/yr
-
TOTAL RECOMMENDED $109,187 $102,601 $91,794
1,238,805
kWh
$15,522
-
kW-mo/yr
$1,871
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs