ITAC Assessment: SF0040
ITAC logo
ITAC Assessment: SF0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Light Fixtures
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 180,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 2,808
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,152 1,899,766
kWh
Natural Gas $117,321 20,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $973 $1,785 $973
8,792
kWh
02 2.7111: Reduce illumination to minimum necessary levels $1,250 - $1,250
11,430
kWh
03 2.3212: Optimize plant power factor $811 $1,150 $811
-
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $409 $1,013 $409
3,810
kWh
05 2.4314: Use synthetic lubricant $444 - $444
4,103
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,261 $600 $4,261
38,980
kWh
TOTAL RECOMMENDED $8,148 $4,548 $8,148
67,115
kWh
TOTAL IMPLEMENTED $8,148 $4,548 $8,148
67,115
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs