ITAC Assessment: MA0799
ITAC logo
ITAC Assessment: MA0799
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 53,375
ft2
Annual Production 500
ton
Production Hrs. Annual 4,463
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,491 2,676,685
kWh
Electricity Demand $71,159 12,354
kW-mo/yr
Electricity Fees $5,767 -
Natural Gas $105,443 11,286
MMBtu
TOTAL YEARLY COSTS $570,860
RECOMMENDED SAVINGS* $68,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,506 $138,640 $35,398
244,126
kWh
$6,843
-
kW-mo/yr
$(-9,735.0)
-
MMBtu
$(-5,000.0)
02 2.2414: Use waste heat from hot flue gases to preheat $17,826 $47,870 - - $17,826
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,442 $14,461 $10,302
71,046
kWh
$1,140
-
kW-mo/yr
- -
04 2.1113: Reduce combustion air flow to optimum $5,709 $2,500 - - $5,709
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,784 $4,000 $4,784
32,990
kWh
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,202 $5,200 $1,398
9,640
kWh
- $(-196.0)
-
MMBtu
-
TOTAL RECOMMENDED $68,469 $212,671 $51,882
357,802
kWh
$7,983
-
kW-mo/yr
$13,604
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $21,935 $20,961 $15,086
104,036
kWh
$1,140
-
kW-mo/yr
$5,709
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs