Assessment Year | 2019 |
---|---|
Principal Product | Aluminum Castings |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
53,375
ft2
|
Annual Production | 500
ton
|
Production Hrs. Annual | 4,463
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $388,491 | 2,676,685 |
kWh
|
$0.15 |
Electricity Demand | $71,159 | 12,354 |
kW-mo/yr
|
$5.76 |
Electricity Fees | $5,767 | - |
|
- |
Natural Gas | $105,443 | 11,286 |
MMBtu
|
$9.34 |
TOTAL YEARLY COSTS | $570,860 | |||
RECOMMENDED SAVINGS* | $68,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,935 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $27,506 | $138,640 |
$35,398
244,126
kWh
|
$6,843
-
kW-mo/yr
|
$(-9,735.0)
-
MMBtu
|
$(-5,000.0) | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $17,826 | $47,870 | - | - |
$17,826
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,442 | $14,461 |
$10,302
71,046
kWh
|
$1,140
-
kW-mo/yr
|
- | - | |
04 | 2.1113: Reduce combustion air flow to optimum | $5,709 | $2,500 | - | - |
$5,709
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,784 | $4,000 |
$4,784
32,990
kWh
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,202 | $5,200 |
$1,398
9,640
kWh
|
- |
$(-196.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $68,469 | $212,671 |
$51,882
357,802
kWh
|
$7,983
-
kW-mo/yr
|
$13,604
-
MMBtu
|
$(-5,000.0) | ||
TOTAL IMPLEMENTED | $21,935 | $20,961 |
$15,086
104,036
kWh
|
$1,140
-
kW-mo/yr
|
$5,709
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs