ITAC Assessment: NL0036
ITAC logo
ITAC Assessment: NL0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Equipment and hardware for hog producers
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 95,000
ft2
Annual Production 115,000
units
Production Hrs. Annual 4,170
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,982 1,262,840
kWh
Electricity Demand $71,291 3,620
kW-mo/yr
Electricity Fees $7,341 -
TOTAL YEARLY COSTS $150,614
RECOMMENDED SAVINGS* $17,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7243: Improve air circulation with destratification fans / other methods $8,990 $37,155 $(-1,084.0)
(-18,966)
kWh
$(-1,026.0)
-
kW-mo/yr
- - $11,100
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,862 $7,623 $1,904
33,398
kWh
$2,958
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,715 $2,905 $1,715
30,081
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,508 $500 $1,760
30,560
kWh
- $(-152.0) $(-100.0) -
05 2.7135: Install occupancy sensors $674 $4,353 $674
11,825
kWh
- - - -
TOTAL RECOMMENDED $17,749 $52,536 $4,969
86,898
kWh
$1,932
-
kW-mo/yr
$(-152.0) $(-100.0) $11,100
TOTAL IMPLEMENTED $17,075 $48,183 $4,295
75,073
kWh
$1,932
-
kW-mo/yr
$(-152.0) $(-100.0) $11,100
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs