Assessment Year | 2019 |
---|---|
Principal Product | Equipment and hardware for hog producers |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
95,000
ft2
|
Annual Production | 115,000
units
|
Production Hrs. Annual | 4,170
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,982 | 1,262,840 |
kWh
|
$0.057 |
Electricity Demand | $71,291 | 3,620 |
kW-mo/yr
|
$19.69 |
Electricity Fees | $7,341 | - |
|
- |
TOTAL YEARLY COSTS | $150,614 | |||
RECOMMENDED SAVINGS* | $17,749 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,075 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $8,990 | $37,155 |
$(-1,084.0)
(-18,966)
kWh
|
$(-1,026.0)
-
kW-mo/yr
|
- | - | $11,100 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,862 | $7,623 |
$1,904
33,398
kWh
|
$2,958
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,715 | $2,905 |
$1,715
30,081
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,508 | $500 |
$1,760
30,560
kWh
|
- | $(-152.0) | $(-100.0) | - | |
05 | 2.7135: Install occupancy sensors | $674 | $4,353 |
$674
11,825
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $17,749 | $52,536 |
$4,969
86,898
kWh
|
$1,932
-
kW-mo/yr
|
$(-152.0) | $(-100.0) | $11,100 | ||
TOTAL IMPLEMENTED | $17,075 | $48,183 |
$4,295
75,073
kWh
|
$1,932
-
kW-mo/yr
|
$(-152.0) | $(-100.0) | $11,100 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs