Assessment Year | 1992 |
---|---|
Principal Product | SHEET METAL ELECRICAL CABINETS |
NAICS |
n/a
|
SIC | 2514: Metal Household Furniture |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,753 | 379,543 |
kWh
|
$0.18 |
Natural Gas | $14,398 | 2,195 |
MMBtu
|
$6.56 |
Fuel Oil #2 | $45,070 | 4,865 |
MMBtu
|
$9.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,503 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $970 | $225 |
$970
5,569
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $540 | $60 |
$540
2,931
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,325 | $10,104 |
$5,325
29,894
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $70 | $40 |
$70
586
kWh
|
- | |
05 | 2.8121: Apply for tax-free status for energy purchases | $1,095 | $200 |
$1,095
-
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $508 | $200 |
$508
2,931
kWh
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $190 | $189 | - |
$190
-
MMBtu
|
|
08 | 2.2437: Recover waste heat from equipment | $294 | $472 | - |
$294
-
MMBtu
|
|
09 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,511 | $600 |
$283
1,465
kWh
|
$1,228
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,503 | $12,090 |
$8,791
43,376
kWh
|
$1,712
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs