ITAC Assessment: HO0021
ITAC logo
ITAC Assessment: HO0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SHEET METAL ELECRICAL CABINETS
NAICS
n/a
SIC 2514: Metal Household Furniture
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,753 379,543
kWh
Natural Gas $14,398 2,195
MMBtu
Fuel Oil #2 $45,070 4,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $970 $225 $970
5,569
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $540 $60 $540
2,931
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,325 $10,104 $5,325
29,894
kWh
-
04 2.4133: Use most efficient type of electric motors $70 $40 $70
586
kWh
-
05 2.8121: Apply for tax-free status for energy purchases $1,095 $200 $1,095
-
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $508 $200 $508
2,931
kWh
-
07 2.2136: Install / repair insulation on steam lines $190 $189 - $190
-
MMBtu
08 2.2437: Recover waste heat from equipment $294 $472 - $294
-
MMBtu
09 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $1,511 $600 $283
1,465
kWh
$1,228
-
MMBtu
TOTAL RECOMMENDED $10,503 $12,090 $8,791
43,376
kWh
$1,712
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs