Assessment Year | 2003 |
---|---|
Principal Product | Adhesives and Sealants |
NAICS | 325520: Adhesive Manufacturing |
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
89,000
ft2
|
Annual Production | 8,000
Tgal
|
Production Hrs. Annual | 4,752
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $219,103 | 4,321,689 |
kWh
|
$0.051 |
Electricity Demand | $109,060 | 15,338 |
kW-mo/yr
|
$7.11 |
Electricity Fees | $27,860 | - |
|
- |
Natural Gas | $75,477 | 11,689 |
MMBtu
|
$6.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,344 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,494 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $44,572 | $57,200 |
$44,572
-
kWh
|
- | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $26,157 | - | - | - | $26,157 | - | |
03 | 2.2136: Install / repair insulation on steam lines | $7,420 | $13,085 |
$5,200
90,000
kWh
|
- | - |
$2,220
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,035 | $1,936 |
$560
9,677
kWh
|
$475
-
kW-mo/yr
|
- | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $850 | - |
$850
14,660
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $780 | $144 |
$550
9,584
kWh
|
$230
-
kW-mo/yr
|
- | - | |
07 | 2.2135: Repair and eliminate steam leaks | $390 | $100 | - | - | - |
$390
-
MMBtu
|
|
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $140 | - |
$140
2,430
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $81,344 | $72,465 |
$51,872
126,351
kWh
|
$705
-
kW-mo/yr
|
$26,157 |
$2,610
-
MMBtu
|
||
TOTAL IMPLEMENTED | $80,494 | $72,465 |
$51,022
111,691
kWh
|
$705
-
kW-mo/yr
|
$26,157 |
$2,610
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs