ITAC Assessment: TA0062
ITAC logo
ITAC Assessment: TA0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Adhesives and Sealants
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 89,000
ft2
Annual Production 8,000
Tgal
Production Hrs. Annual 4,752
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,103 4,321,689
kWh
Electricity Demand $109,060 15,338
kW-mo/yr
Electricity Fees $27,860 -
Natural Gas $75,477 11,689
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,494

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8112: Combine utility meters $44,572 $57,200 $44,572
-
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $26,157 - - - $26,157 -
03 2.2136: Install / repair insulation on steam lines $7,420 $13,085 $5,200
90,000
kWh
- - $2,220
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,035 $1,936 $560
9,677
kWh
$475
-
kW-mo/yr
- -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $850 - $850
14,660
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $780 $144 $550
9,584
kWh
$230
-
kW-mo/yr
- -
07 2.2135: Repair and eliminate steam leaks $390 $100 - - - $390
-
MMBtu
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $140 - $140
2,430
kWh
- - -
TOTAL RECOMMENDED $81,344 $72,465 $51,872
126,351
kWh
$705
-
kW-mo/yr
$26,157 $2,610
-
MMBtu
TOTAL IMPLEMENTED $80,494 $72,465 $51,022
111,691
kWh
$705
-
kW-mo/yr
$26,157 $2,610
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs