Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,055

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1088 #06 Y:2024 Meter recycled water (to reduce sewer charges) $392 $1,225
UD1088 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $17,430 $48,200
UD1088 #03 Y:2024 Install compressor air intakes in coolest locations $1,590 $400
UD1088 #02 Y:2024 Eliminate or reduce compressed air usage $1,698 $6,900
UD1086 #11 Y:2024 Meter recycled water (to reduce sewer charges) $6,817 -
UD1086 #10 Y:2024 Optimize plant power factor $7,429 $25,300
UD1086 #09 Y:2024 Eliminate or reduce compressed air usage $4,459 $7,620
UD1086 #08 Y:2024 Eliminate or reduce compressed air usage $4,780 -
UD1086 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $10,965 $1,068
UD1086 #05 Y:2024 Reduce space conditioning during non-working hours $8,962 $7,238
UD1086 #04 Y:2024 Use properly designed and sized hvac equipment $13,233 -
UD1086 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $54 -
UD1086 #01 Y:2024 Reduce illumination to minimum necessary levels $12,814 -
UD1085 #09 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,175 $3,294
UD1085 #08 Y:2024 Use waste heat from hot flue gases to preheat $4,403 $20,475
UD1085 #07 Y:2024 Use waste heat from hot flue gases to preheat $13,159 $20,475
UD1085 #06 Y:2024 Turn off equipment when not in use $58,447 -
UD1085 #05 Y:2024 Meter recycled water (to reduce sewer charges) $3,170 $760
UD1085 #04 Y:2024 Eliminate or reduce compressed air usage $168 $52
UD1085 #02 Y:2024 Turn off equipment when not in use $7,415 -