5,074
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WV0669 #15 Y:2024 | 15 | 2024 | Remove or close off unneeded compressed air lines | $397 | $1,920 | |
WV0669 #10 Y:2024 | 10 | 2024 | Use flue gases to heat process or service water | $2,422 | $7,600 | |
WV0669 #09 Y:2024 | 09 | 2024 | Upgrade controls on compressors | $3,954 | $10,900 | |
WV0669 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $5,194 | $16,795 | |
WV0669 #06 Y:2024 | 06 | 2024 | Recycle air for heating, ventilation and air conditioning | $6,200 | $11,000 | |
WV0669 #05 Y:2024 | 05 | 2024 | Install outside air damper / economizer on hvac unit | $6,542 | $14,640 | |
WV0669 #04 Y:2024 | 04 | 2024 | Use demand controller or load shedder | $11,909 | $6,900 | |
WV0669 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $17,884 | $35,717 | |
UD1089 #06 Y:2024 | 06 | 2024 | Use waste heat from hot flue gases to preheat | $6,228 | $27,650 | |
UD1089 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $472 | $550 | |
UD1089 #04 Y:2024 | 04 | 2024 | Install compressor air intakes in coolest locations | $7,169 | $2,030 | |
UD1089 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $30,384 | - | |
UD1089 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $79,860 | - | |
UD1088 #06 Y:2024 | 06 | 2024 | Meter recycled water (to reduce sewer charges) | $392 | $1,225 | |
UD1088 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $17,430 | $48,200 | |
UD1088 #03 Y:2024 | 03 | 2024 | Install compressor air intakes in coolest locations | $1,590 | $400 | |
UD1088 #02 Y:2024 | 02 | 2024 | Eliminate or reduce compressed air usage | $1,698 | $6,900 | |
UD1087 #07 Y:2024 | 07 | 2024 | Reduce illumination to minimum necessary levels | $303 | $900 | |
UD1087 #06 Y:2024 | 06 | 2024 | Install occupancy sensors | $399 | $1,254 | |
UD1087 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $3,614 | $6,258 |