5,166
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0688 #07 Y:2025 | 07 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $4,391 | $10,040 | |
| WV0688 #06 Y:2025 | 06 | 2025 | Use evaporation to concentrate material | $4,913 | $21,336 | |
| WV0688 #05 Y:2025 | 05 | 2025 | Upgrade controls on compressors | $5,215 | $5,557 | |
| WV0688 #04 Y:2025 | 04 | 2025 | Install outside air damper / economizer on hvac unit | $6,295 | $24,800 | |
| WV0688 #01 Y:2025 | 01 | 2025 | Use or replace with energy efficient substitutes | $18,599 | $24,000 | |
| UD1115 #04 Y:2025 | 04 | 2025 | Insulate bare equipment | $892 | $1,267 | |
| UD1113 #03 Y:2025 | 03 | 2025 | Eliminate or reduce compressed air usage | $3,832 | $4,200 | |
| UD1113 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,857 | $1,312 | |
| UD1113 #01 Y:2025 | 01 | 2025 | Install outside air damper / economizer on hvac unit | $11,142 | $3,621 | |
| UD1112 #06 Y:2025 | 06 | 2025 | Utilize a less expensive cooling method | $110,329 | $50,000 | |
| UD1112 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $115,397 | $2,116,590 | |
| UD1111 #07 Y:2025 | 07 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $690 | $953 | |
| UD1111 #06 Y:2025 | 06 | 2025 | Install compressor air intakes in coolest locations | $1,406 | $2,030 | |
| UD1111 #05 Y:2025 | 05 | 2025 | Meter recycled water (to reduce sewer charges) | $1,836 | $2,500 | |
| UD1111 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $621 | $782 | |
| UD1111 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $10,758 | $10,506 | |
| UD1111 #02 Y:2025 | 02 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $216 | - | |
| UD1110 #09 Y:2025 | 09 | 2025 | Optimize plant power factor | $27,844 | $76,225 | |
| UD1110 #08 Y:2025 | 08 | 2025 | Recover waste heat from equipment | $8,078 | $19,900 | |
| UD1110 #07 Y:2025 | 07 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,182 | $953 |