5,137
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0678 #11 Y:2025 | 11 | 2025 | Replace obsolete burners with more efficient ones | $4,279 | $18,380 | |
| WV0678 #10 Y:2025 | 10 | 2025 | Use flue gases to heat process or service water | $4,453 | $20,950 | |
| WV0678 #05 Y:2025 | 05 | 2025 | Use steam condensate for hot water supply (non-potable) | $11,667 | $55,000 | |
| WV0678 #03 Y:2025 | 03 | 2025 | Use or replace with energy efficient substitutes | $20,707 | $41,750 | |
| WV0678 #02 Y:2025 | 02 | 2025 | Upgrade controls on compressors | $22,738 | $38,304 | |
| WV0678 #01 Y:2025 | 01 | 2025 | Minimize water usage | $16,085 | $31,231 | |
| UD1106 #03 Y:2024 | 03 | 2024 | Install vinyl strip / high speed / air curtain doors | $11,902 | $8,000 | |
| UD1102 #09 Y:2024 | 09 | 2024 | Use properly designed and sized hvac equipment | $5,671 | - | |
| UD1102 #08 Y:2024 | 08 | 2024 | Optimize plant power factor | $9,007 | $30,514 | |
| UD1102 #07 Y:2024 | 07 | 2024 | Use or replace with energy efficient substitutes | $326,496 | $385,000 | |
| UD1102 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $61,605 | $8,161 | |
| UD1102 #03 Y:2024 | 03 | 2024 | Recover waste heat from equipment | $798 | $1,000 | |
| UD1102 #02 Y:2024 | 02 | 2024 | Install outside air damper / economizer on hvac unit | $1,107 | $2,722 | |
| UD1102 #01 Y:2024 | 01 | 2024 | Use properly designed and sized hvac equipment | $52,334 | - | |
| UD1105 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $41,991 | $373,800 | |
| UD1104 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $6,793 | $92,400 | |
| UD1103 #05 Y:2024 | 05 | 2024 | Use heat pump for space conditioning | $6,351 | $81,000 | |
| UD1103 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $20,580 | $273,000 | |
| UD1101 #11 Y:2024 | 11 | 2024 | Optimize plant power factor | $1,101 | $4,400 | |
| UD1101 #10 Y:2024 | 10 | 2024 | Install occupancy sensors | $94 | - |