ITAC Assessment: UD1096
ITAC logo
ITAC Assessment: UD1096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aerospace Components
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 174,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,461 2,541,811
kWh
Electricity Demand $35,810 6,034
kW-mo/yr
Electricity Fees $5,679 -
Natural Gas $34,760 5,590
MMBtu
Waste Disposal Costs
Water Usage $4,098 60
Tgal
Water Disposal $5,987 60
Tgal
Other Liquid (non-haz) $279 1
gal
TOTAL YEARLY COSTS $362,074
RECOMMENDED SAVINGS* $46,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $3,966 - $2,208
20,364
kWh
- $1,758
-
MMBtu
- -
02 2.7241: Install outside air damper / economizer on hvac unit $407 - $407
3,755
kWh
- - - -
03 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $10,522 $1,061 $7,840
72,322
kWh
- $2,682
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $780 $872 $644
5,942
kWh
$136
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,767 $6,096 $4,190
38,657
kWh
- - $501 $76
06 2.7135: Install occupancy sensors $1,551 $5,809 $1,384
12,767
kWh
- - - $167
07 2.9114: Use solar heat to make electricty $24,210 $242,106 $21,425
197,655
kWh
$2,785
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $46,203 $255,944 $38,098
351,462
kWh
$2,921
-
kW-mo/yr
$4,440
-
MMBtu
$501 $243
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs