Assessment Year | 2025 |
---|---|
Principal Product | Injection Molded and Extruded Plastic Components for Motor Vehicles |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
125,000
ft2
|
Annual Production | 1,020,865
units
|
Production Hrs. Annual | 6,420
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $256,634 | 3,348,063 |
kWh
|
$0.077 | |
Electricity Demand | $42,979 | 8,595 |
kW-mo/yr
|
$5.00 | |
Electricity Fees | $5,654 | - |
|
- | |
Natural Gas | $6,589 | 794 |
MMBtu
|
$8.30 | |
Waste Disposal Costs | |||||
Water Usage | $1,248 | 186 |
Tgal
|
$6.71 | |
Water Disposal | $960 | 186 |
Tgal
|
$5.16 | |
Other Liquid (non-haz) | $126 | 1 |
gal
|
$126.00 | |
TOTAL YEARLY COSTS | $314,190 | ||||
RECOMMENDED SAVINGS* | $33,190 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $5,147 | $1,610 |
$4,574
59,637
kWh
|
$573
-
kW-mo/yr
|
- | - | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $15,813 | $5,000 |
$12,542
163,522
kWh
|
$3,271
-
kW-mo/yr
|
- | - | - | |
03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $6,529 | $7,106 |
$4,552
59,354
kWh
|
- |
$1,977
-
MMBtu
|
- | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $2,612 | $306 |
$2,612
34,058
kWh
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,550 | $1,184 |
$1,550
20,205
kWh
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $715 | $1,235 |
$635
8,276
kWh
|
$80
-
kW-mo/yr
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $513 | - |
$456
5,942
kWh
|
$57
-
kW-mo/yr
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $311 | $509 |
$235
3,058
kWh
|
$25
-
kW-mo/yr
|
- | $39 | $12 | |
TOTAL RECOMMENDED | $33,190 | $16,950 |
$27,156
354,052
kWh
|
$4,006
-
kW-mo/yr
|
$1,977
-
MMBtu
|
$39 | $12 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs