ITAC Assessment: UD1097
ITAC logo
ITAC Assessment: UD1097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rubber Products Utilizing Recycled Tires
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area 20,000
ft2
Annual Production 50,915
ton
Production Hrs. Annual 5,660
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,620 5,460,223
kWh
Electricity Demand $338,033 18,283
kW-mo/yr
Electricity Fees $68,741 -
Waste Disposal Costs
Water Usage $9,812 2,068
Tgal
Other Liquid (non-haz) $16,116 1
gal
TOTAL YEARLY COSTS $664,322
RECOMMENDED SAVINGS* $84,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $63,287 - - $63,287
-
kW-mo/yr
-
02 3.4156: Use flow control valves on equipment to optimize water use $2,598 $104 - - $2,598
-
Tgal
03 3.4151: Minimize water usage $1,616 - - - $1,616
-
Tgal
04 2.6212: Turn off equipment during breaks, reduce operating time $1,568 - $1,568
35,974
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $471 $320 $297
6,821
kWh
$174
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $400 $900 $253
5,809
kWh
$147
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $296 - $187
4,293
kWh
$109
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,220 $14,406 $9,220
207,733
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,544 - $2,396
54,888
kWh
$2,148
-
kW-mo/yr
-
TOTAL RECOMMENDED $84,000 $15,730 $13,921
315,518
kWh
$65,865
-
kW-mo/yr
$4,214
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs