ITAC Assessment: UD1099
ITAC logo
ITAC Assessment: UD1099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Rubber Accessories for Motor Vehicles
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,040
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,344 579,647
kWh
Electricity Demand $9,616 1,901
kW-mo/yr
Electricity Fees $3,980 -
Natural Gas $13,613 1,540
MMBtu
Waste Disposal Costs
Water Usage $3,070 109
Tgal
Water Disposal $571 109
Tgal
Other Liquid (non-haz) $456 1
gal
TOTAL YEARLY COSTS $91,650
RECOMMENDED SAVINGS* $39,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Primary Product Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,391 - - $4,391
-
kW-mo/yr
- - -
02 2.7444: Close holes and openings in building such as broken windows $2,105 - - - $2,105
-
MMBtu
- -
03 2.7442: Keep doors and windows shut when not on use $1,162 - $901
8,657
kWh
- $261
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $568 - $223
2,142
kWh
- $345
-
MMBtu
- -
05 2.8114: Change rate schedules or other changes in utility service $2,633 $1,322 - - - $2,633
-
Tgal
-
06 2.7135: Install occupancy sensors $2,877 $3,498 $2,557
24,562
kWh
- - - $320
07 2.4226: Use / purchase optimum sized compressor $1,580 $5,371 $1,580
15,174
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $283 $953 $220
2,114
kWh
$63
-
kW-mo/yr
- - -
09 2.9114: Use solar heat to make electricty $24,032 $480,632 $20,728
199,116
kWh
$3,304
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $39,631 $491,776 $26,209
251,765
kWh
$7,758
-
kW-mo/yr
$2,711
-
MMBtu
$2,633
-
Tgal
$320
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs