527
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
DL0237 #09 Y:2024 | 09 | 2024 | Replace existing hvac unit with high efficiency model | $5,873 | $30,027 | |
DL0237 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $333 | $252 | |
DL0237 #07 Y:2024 | 07 | 2024 | Recycle air for heating, ventilation and air conditioning | $682 | $4,000 | |
DL0235 #07 Y:2023 | 07 | 2023 | Adjust vents to minimize energy use | $814 | $1,500 | |
DL0235 #06 Y:2023 | 06 | 2023 | Reduce ventilation air | $1,085 | - | |
DL0235 #05 Y:2023 | 05 | 2023 | Install vinyl strip / high speed / air curtain doors | $646 | $3,000 | |
DL0235 #03 Y:2023 | 03 | 2023 | Utilize controls to operate equipment only when needed | $2,885 | $500 | |
DL0235 #02 Y:2023 | 02 | 2023 | Install timers and/or thermostats | $751 | $800 | |
DL0231 #08 Y:2023 | 08 | 2023 | Repair furnaces and oven doors so that they seal efficiently | $266,000 | $385,800 | |
DL0231 #07 Y:2023 | 07 | 2023 | Improve combustion control capability | $211,766 | $21,800 | |
DL0231 #06 Y:2023 | 06 | 2023 | Maintain machines to reduce leaks | $441,845 | $39,600 | |
DL0231 #05 Y:2023 | 05 | 2023 | Maintain machines to reduce leaks | $132,876 | $34,600 | |
DL0231 #04 Y:2023 | 04 | 2023 | Insulate bare equipment | $25,112 | $9,768 | |
DL0231 #03 Y:2023 | 03 | 2023 | Use or replace with energy efficient substitutes | $149,450 | $333,800 | |
DL0231 #02 Y:2023 | 02 | 2023 | Replace existing equipment with more suitable substitutes | $229,694 | $2,880,000 | |
DL0231 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $172,461 | $34,600 | |
WV0646 #10 Y:2023 | 10 | 2023 | Install compressor air intakes in coolest locations | $3,040 | $9,723 | |
WV0646 #07 Y:2023 | 07 | 2023 | Use cooling tower or economizer to replace chiller cooling | $5,257 | $16,181 | |
WV0646 #04 Y:2023 | 04 | 2023 | Use steam pressure reduction to generate power | $9,785 | $48,224 | |
WV0646 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $35,692 | $89,814 |