ITAC Assessment: DL0244
ITAC logo
ITAC Assessment: DL0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Corrugated Paper
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 154
Plant Area 215,000
ft2
Annual Production 634,000
thousand feet
Production Hrs. Annual 6,400
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $714,467 6,069,577
kWh
Electricity Demand $180,581 11,785
kW-mo/yr
Electricity Fees $5,965 -
Natural Gas $393,363 57,744
MMBtu
Waste Disposal Costs
Water Usage $72,887 5,681
Tgal
TOTAL YEARLY COSTS $1,367,263
RECOMMENDED SAVINGS* $449,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.2127: Flash condensate to produce lower pressure steam $6,357 $1,000 - $5,421
-
MMBtu
$936
-
Tgal
-
02 2.4226: Use / purchase optimum sized compressor $6,768 - $6,768
57,352
kWh
- - -
03 2.6218: Turn off equipment when not in use $22,165 $5,000 $22,165
187,840
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,278 $20,000 $52,278
443,034
kWh
- - -
05 3.4155: Meter waste water $7,907 $2,000 - - - $7,907
06 2.9114: Use solar heat to make electricty $354,000 $3,000,000 $354,000
3,000,000
kWh
- - -
TOTAL RECOMMENDED $449,475 $3,028,000 $435,211
3,688,226
kWh
$5,421
-
MMBtu
$936
-
Tgal
$7,907
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs